“We chose Sutcliffe to design and build our 90 m x 30 m high bay assembly and welfare facility complex because it was able to demonstrate that it could provide a turnkey engineered solution within a target cost and build schedule for a high specification manufacturing extension. Sutcliffe successfully managed the engineering and integration of the facility including two wide bay 20 ton cranes and three 2.5 ton wall mounted cantilever cranes. Sutcliffe continues to remain a premier supplier for us for engineered renovation and new construction projects and services within our Cross Hills manufacturing facility.”